FOCUS ON HYDRAULICS
MORE THAN 10 YEARS
PROFESSIONAL
POWER UNIT,GEAR PUMP MANUFACTURE

Tailgate Power Units

1. The duty of this power unit is S3, ie. 30 seconds on and 270 seconds off.
2. Clean all the hydraulic parts concerned before mounting the power unit.
3. Viscosity of the hydraulic oil should be 15-68 cst, which should also be clean and free of impurities. N46 hydraulic oil is recommended.
4. Oil renewing is required after the initial 100 operation hours, afterwards once erery 3000 hours.
5. The power unit should be mounted horizontally.

Category:

General description
Equipped with two zero leakage double-check solenoid valves, this power unit has independent circuits for the lifting cylinder and rotating cylinder of tailgate of electrical garbage truck.

Outline Dimension

Model Specifications

No.ModelMotor VoltMotor Power (KW)Displacement (ml/r)System Pressure (MPa)Rated Speed (RMP)Tank Capacity (L)
1DYDD-1.6BAO-FVDC-3712V DC1.61.61625008
2DYDD-2.0DAP-FVDC-3712V DC2.02.016250012
3DYDD-2.5GBQ-FVDC-3712V DC2.52.516250020
4DYDD-1.6BBO-FVDC-3724V DC1.61.61625008
5DYDD-2.0DBP-FVDC-3724V DC2.02.016250012
6DYDD-2.5GAQ-FVDC-3724V DC2.52.516250020

Remarks: Please consult our sales engineer for the different pump displacement, motor power or tank capacity.

Scroll to Top